13 Gauge HPPE Liner Solid Latex Palm Coated TPR for Anti-impact

Short Description:

1.Good impact resistance and cut resistance

2.Has higher wear resistance


  • Sizes:: 6''/7''/8''/9''/10''/11''
  • Min.Order Quantity: 1000pairs
  • Color:: customized
  • Product Detail

    CERTIFICATION

    FAQ

    Packing

    Factory Show

    Product Tags

    Name : 13 Gauge HPPE Liner Solid Latex Palm Coated TPR for Anti-impact

    PRODUCT DETAILS:

    Construction        Mechanical Gloves Anti-Impact,anti-cutting
    Coating Material       Solid Latex excellet Abrasion
    Liner Material 13 gauge HPPE liner high performance of cutting
    Back Quality TPR impact Resistant on working
    Cuff Knit Wrist Firmly attached to the wrist
    Available Sizes 6/7/8/9/10/11 Different sizes for chose
    Length 22/23/24/25/26cm Standard Sizes measure

    PACKING:

    • 12 pairs in a bag; 120 pairs in a carton

    STANDARDS AND CERTIFICATIONS:

    • EN388  :4x44C

    INDUSTRIES:

    . Metal fabrication

    • Automotive
    • Mining
    • Better Grip
    • Mechanical gloves for impact protection

     






  • Previous:
  • Next:

  • product certification (3)product certification (4)product certification (4)/quality/

    1.Is samples could supply? Is it free or charge cost? What is the delivery time .

    Answer: Yes, we would like supply samples as your request.

    General samples are free for 2-3pairs each model. Lead time 2-3days.

    If your samples need customized such as special material, with logo or others .

    it will be depends on the cost,the lead time about 5-7days.

     

    2.Is the products can be with our own logo?

    Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.

     

    3.Do you have Minimum Order Quantity ?

    Yes, MOQ are from 100dozens-2000dozens for differenct items.

    if you have special request or need small quantity for test , pls contact our sales for solution.

     

    4.What is the average lead time?

     

    For mass production, the lead time is general 30 days after receiving the deposit payment.

     

    5.What kinds of payment methods do you accept?

    TT, Western Union  , Paypal, D/P at sight . Our payment terms are optional .

    By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .

     

     

    FACTORY SHOWFACTORY SHOW -1