China Gold Supplier for Industrial Freezer Gloves - ITEM NO. DQ503 – Handprotect Detail:
ITEM NO.:DQ503
Interlock liner of back,Towel liner of Palm
Nitrile Full Coated
Knit Wrist
PRODUCT DETAILS:
| Available Sizes | 9/10/10.5” |
| Coating Material | Blue Nitrile |
| Construction | CUT&SEWN |
| Cuff Style | Knit Wirst |
| Finish | Fully Coated |
| Length | 24/25/26cm |
| Color | Blue |
| Liner Material | Interlock liner of back, Towel Liner of Palm |
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4121
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:

Related Product Guide:
We have our own sales team, design team, technical team, QC team and package team. We have strict quality control procedures for each process. Also, all of our workers are experienced in printing field for China Gold Supplier for Industrial Freezer Gloves - ITEM NO. DQ503 – Handprotect, The product will supply to all over the world, such as: Greece , US , Niger , With high quality, reasonable price, on-time delivery and customized & personalized services to help customers achieve their goals successfully, our company has got praise in both domestic and foreign markets. Buyers are welcome to contact us.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
The product classification is very detailed that can be very accurate to meet our demand, a professional wholesaler.











