Factory directly Heavy Duty Heat Resistant Gloves - ITEM NO. PU608B-copper – Handprotect Detail:
13 gauge COPPER/NYLONE ESD PU glove
Item No.:PU608B-copper
PRODUCT DETAILS:
| Available Sizes | 6/7/8/9/10/11” |
| Coating Material | PU |
| Construction | Knitted |
| Cuff Style | Knit Wrist |
| Finish | Palm Coated |
| Length | 22/23/24/25/26/27cm |
| Liner Material | 13 gauge copper fiber nylon liner |
| Feature | ESD |
FEATURE
- high level of Copper fiber ESD gloves -anti-static glove
- soft and comfortable grip
- Excellent grip and touch
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388:2016 4131
- EN16350:2014
INDUSTRIES:
- Automotive
- Laboratory
- dust-free room
- Electrical factory
- Electrical components assembly&installation
Product detail pictures:



Related Product Guide:
We pursue the administration tenet of "Quality is superior, Services is supreme, Standing is first", and will sincerely create and share success with all customers for Factory directly Heavy Duty Heat Resistant Gloves - ITEM NO. PU608B-copper – Handprotect, The product will supply to all over the world, such as: Libya , Amsterdam , Denver , We have a strict and complete quality control system, which ensures that each product can meet quality requirements of customers. Besides, all of our products have been strictly inspected before shipment.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.











