Factory Supply Esd Nitrile Gloves - Winter Use Sandy Nitrile Gauntlet Item No.:DQ415 – Handprotect Detail:
|
Available Sizes
|
6/7/8/9/10/11
|
|
Coating Material
|
Sandy Nitrile
|
|
Construction
|
Sewn
|
|
Cuff Style
|
Gauntlet
|
|
Gauge
|
N/A
|
|
Length
|
27/30/35cm
|
|
Color
|
Blue
|
|
Liner Material
|
Acrylic Towel Liner/Winter Use
|
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:

Related Product Guide:
"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our firm to the long-term to develop together with consumers for mutual reciprocity and mutual advantage for Factory Supply Esd Nitrile Gloves - Winter Use Sandy Nitrile Gauntlet Item No.:DQ415 – Handprotect, The product will supply to all over the world, such as: Miami , Malaysia , Turkmenistan , By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified products and the control of the industry trend as well as our maturity before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.











