New Arrival China Oil Resistant Gloves Mechanic - ITEM NO. DQ300 – Handprotect Detail:
Name : Nitrile heavy duty glove with chips
Item No.:DQ300
PRODUCT DETAILS:
| Available Sizes | 9/10/11 |
| Coating Material | smooth nitrile with chips |
| Construction | CUT&SEWN |
| Cuff Style | SAFETY CUFF |
| Fishing | Fully Coated |
| Gauge | N/A |
| Length | 25/26/27cm |
| Color | BLUE |
| Liner Material | JERSEY |
PACKING:
- 12 pairs in a bag; 10 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4121
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:

Related Product Guide:
Our team through qualified training. Skilled professional knowledge, powerful sense of support, to satisfy the support desires of consumers for New Arrival China Oil Resistant Gloves Mechanic - ITEM NO. DQ300 – Handprotect, The product will supply to all over the world, such as: Norway , Madras , Turkey , With strong technical strength and advanced production equipment, and SMS people purposefully , professional, dedicated spirit of enterprise. Enterprises took the lead through the ISO 9001:2008 international quality management system certification, CE certification EU ; CCC.SGS.CQC other related product certification. We look forward to reactivating our company connection.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!











