OEM Factory for Thermal Waterproof Work Gloves - ITEM NO.:DMPU608B-yellow – Handprotect

Short Description:


Product Detail

CERTIFICATION

FAQ

Packing

Factory Show

Product Tags

Related Video

Feedback (2)

We take "customer-friendly, quality-oriented, integrative, innovative" as objectives. "Truth and honesty" is our management ideal for Sandy Nitrile Coated Glove , Construction Safety Gloves , Pvc Coated Hand Gloves , We welcome new and outdated shoppers from all walks of lifetime to call us for long term company associations and mutual accomplishment!
OEM Factory for Thermal Waterproof Work Gloves - ITEM NO.:DMPU608B-yellow – Handprotect Detail:

ITEM NO.: DMPU608B-yellow

13 Gauge white HPPE+color polyester mixed Liner

PU Palm Coated


Product detail pictures:

OEM Factory for Thermal Waterproof Work Gloves -
 ITEM NO.:DMPU608B-yellow – Handprotect detail pictures


Related Product Guide:

We constantly think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body along with the living for OEM Factory for Thermal Waterproof Work Gloves - ITEM NO.:DMPU608B-yellow – Handprotect, The product will supply to all over the world, such as: Turin , Kuwait , Albania , With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.

product certification (3)product certification (4)product certification (4)/quality/

1.Is samples could supply? Is it free or charge cost? What is the delivery time .

Answer: Yes, we would like supply samples as your request.

General samples are free for 2-3pairs each model. Lead time 2-3days.

If your samples need customized such as special material, with logo or others .

it will be depends on the cost,the lead time about 5-7days.

 

2.Is the products can be with our own logo?

Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.

 

3.Do you have Minimum Order Quantity ?

Yes, MOQ are from 100dozens-2000dozens for differenct items.

if you have special request or need small quantity for test , pls contact our sales for solution.

 

4.What is the average lead time?

 

For mass production, the lead time is general 30 days after receiving the deposit payment.

 

5.What kinds of payment methods do you accept?

TT, Western Union  , Paypal, D/P at sight . Our payment terms are optional .

By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .

 

 

FACTORY SHOWFACTORY SHOW -1

  • Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Natalie from Korea - 2017.06.29 18:55
    Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Georgia from Marseille - 2017.10.23 10:29