Short Lead Time for Electrical Protection Gloves - ITEM NO. PV410 – Handprotect

Short Description:


Product Detail

CERTIFICATION

FAQ

Packing

Factory Show

Product Tags

Related Video

Feedback (2)

We have now sophisticated machines. Our solutions are exported to the USA, the UK and so on, enjoying a great reputation amid consumers for Firm Grip Nitrile Coated Gloves , Gloves Rubber Industrial , Nitrile Mechanics Gloves , You should send us your specifications and requirements, or feel totally free to speak to us with any questions or inquiries that you may have.
Short Lead Time for Electrical Protection Gloves - ITEM NO. PV410 – Handprotect Detail:

Name :  double color PVC Sandy Finish Gauntlet

Item No.:PV410

PRODUCT DETAILS:

Available Sizes 9/10/11
Coating Material  Sandy PVC
Construction CUT&SEWN
Cuff Style GUANTLET
Fishing Fully Coated
Gauge N/A
Length 30cm
Color  black sandy with red cuff
Liner Material  Interlock liner

PACKING:

  • 12 pairs in a bag; 72 pairs in a carton

STANDARDS AND CERTIFICATIONS:

  • EN388  4121

         EN374

INDUSTRIES:

  •  Machinery and Equipment
  •  Chemical
  •  Metal fabrication
  •  Automotive
  •  Mining
  •  Oil and gas

Product detail pictures:

Short Lead Time for Electrical Protection Gloves -
 ITEM NO. PV410 – Handprotect detail pictures


Related Product Guide:

No matter new customer or previous client, We believe in prolonged time period and trustworthy relationship for Short Lead Time for Electrical Protection Gloves - ITEM NO. PV410 – Handprotect, The product will supply to all over the world, such as: Plymouth , Guinea , Doha , Our aim is to help customers realize their goals. We are making great efforts to achieve this win-win situation and sincerely welcome you to join us. In a word, when you choose us, you choose a perfect life. Welcome to visit our factory and welcome your order! For further inquiries, please do not hesitate to contact us.

product certification (3)product certification (4)product certification (4)/quality/

1.Is samples could supply? Is it free or charge cost? What is the delivery time .

Answer: Yes, we would like supply samples as your request.

General samples are free for 2-3pairs each model. Lead time 2-3days.

If your samples need customized such as special material, with logo or others .

it will be depends on the cost,the lead time about 5-7days.

 

2.Is the products can be with our own logo?

Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.

 

3.Do you have Minimum Order Quantity ?

Yes, MOQ are from 100dozens-2000dozens for differenct items.

if you have special request or need small quantity for test , pls contact our sales for solution.

 

4.What is the average lead time?

 

For mass production, the lead time is general 30 days after receiving the deposit payment.

 

5.What kinds of payment methods do you accept?

TT, Western Union  , Paypal, D/P at sight . Our payment terms are optional .

By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .

 

 

FACTORY SHOWFACTORY SHOW -1

  • This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Henry stokeld from Accra - 2017.05.02 18:28
    The customer service reprersentative explained very detailed, service attitude is very good, reply is very timely and comprehensive, a happy communication! We hope to have a opportunity to cooperate.
    5 Stars By Arthur from South Africa - 2018.06.28 19:27