Well-designed Industrial Safety Gloves - ITEM NO. PV412 – Handprotect Detail:
Name : PVC Sandy Finish Glove with Seamless cotton liner
Item No.:PV412
PRODUCT DETAILS:
| Available Sizes | 8/9/10/11/12 |
| Coating Material | PVC Sandy |
| Construction | Knitted |
| Cuff Style | Open Cuff |
| Gauge | 13 |
| Length | 27/30/33/35cm |
| Color Available | Blue/Red/Pink ect |
| Liner Material | 100% Seamless cotton |
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4121
EN374
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:

Related Product Guide:
As for competitive charges, we believe that you will be searching far and wide for anything that can beat us. We will state with absolute certainty that for such excellent at such charges we have been the lowest around for Well-designed Industrial Safety Gloves - ITEM NO. PV412 – Handprotect, The product will supply to all over the world, such as: Lithuania , Haiti , Costa rica , At Present, our merchandise have been exported to more than sixty countries and different regions, such as Southeast Asia, America, Africa, Eastern Europe, Russia, Canada etc. We sincerely hope to establish wide contact with all potential customers both in China and the rest part of the world.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
The manufacturer gave us a big discount under the premise of ensuring the quality of products, thank you very much, we will select this company again.











