Wholesale Price Black Industrial Nitrile Gloves - ITEM NO. DQ708BD-yellow – Handprotect Detail:
Name : Nitrile Micro-Foam Dotted Glove
15 gauge nylon&lycra liner, Nitrile Micro-foam palm coated, with nitrile dotted
Item No.:DQ708BD
PRODUCT DETAILS:
| Available Sizes | 6/7/8/9/10/11 |
| Coating Material | Nitrile Micro-Foam+Nitrile Dotted |
| Construction | Knitted |
| Cuff Style | Knitwrist |
| Fishing | Palm Coated |
| Gauge | 15 gauge |
| Length | 22/23/24/25/26cm |
| Color | Yellow+yellow dotted |
| Liner Material | Nylon+lycra |
PACKING:
- 12 pairs in a bag; 10 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 3122
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:


Related Product Guide:
We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Wholesale Price Black Industrial Nitrile Gloves - ITEM NO. DQ708BD-yellow – Handprotect, The product will supply to all over the world, such as: United Arab Emirates , Florence , Macedonia , Strict quality control is executed in each link of the whole production process.We sincerely hope to establish the friendly and mutual-beneficial cooperation with you. Based on high quality products and perfect pre-sales /after-sales service is our idea, some clients had cooperated with us for more than 5 years.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
In our cooperated wholesalers, this company has the best quality and reasonable price, they are our first choice.











